The interesting article by David Clark, David Janecky,
and Leonard Lane (PHYSICS TODAY, September 2006, page 34) about the cleanup at Rocky Flats noted
advances in understanding radioactivity migration and pointed to a high level of stakeholder
participation in planning. However, it also raised some questions for me.
Were percolation tests
done to check the isolation of deep groundwater from the top 30 meters? The presence of what the authors
call "highly impermeable bedrock" between the deep and shallow waters could be expected to protect
the deep water table, but was it checked? The authors say, "Approximately 90 percent of the radioactive
inventory was in the top 12 cm of the soil." They also state that "the work focused on removing soil
contaminated . . . down to one meter below the surface, and replacing it with fresh
soil; soil contaminated at depths greater than one meter was allowed to remain in place, even at
higher concentrations. To decontaminate the concrete walls of buildings, workers used a variety
of techniques." I believe it was implied that the 903 Pad was demolished and the fragments removed
along with the chemical drums that sat on it. How geographically dense were the post-remediation
soil samples in the pad area and downstream of it?
The article also mentioned
that some control measures will require regular maintenance. How long? Ten half-lives of plutonium?
Who is in charge of it, and who is paying for it?
How were the removals disposed
of? Were they encapsulated? Are they secure from natural and human influence? Did the stakeholders
understand and have any influence on the methods used and the final disposal? If so, I would agree
with the authors that the full involvement and sign-off of stakeholders are a key advance in dealing
with the problems involved with such a difficult undertaking. It is striking that the Yucca Mountain
nuclear waste storage facility has not yet been able to get the agreement of its stakeholders after
a much longer passage of time.
The article "Science-Based
Cleanup of Rocky Flats" demonstrates a clear conflict of interest. For the record, the authors
worked for Kaiser-Hill Co, the US Department of Energy contractor responsible for cleaning up
Rocky Flats; their neutrality is suspect. Independent, scientific reviews of the cleanup have
been written by contractors that neighboring municipalities hired, by a consortium of water users,
and by DOE-hired experts.1–3 All the reviewers expressed concern about the
effectiveness of the remediation.
Plutonium dioxide is known
to exist on the site as a finely dispersed solid. In that form it can be carried as part of a colloidal
suspension in the groundwater. It will also be suspended in the air if burrowing animals bring it
up from the contaminated rubble left on the site. Additionally, no independent evaluation has
been conducted of the bedrock under the 10-square-mile site, which is in an earthquake zone. It
is questionable that an area of this size will have no fractures in the event of an earthquake. Two
unlined 20-acre, 40-foot-deep landfills were left on the site, covered by only a few feet of soil.
Not only do they contain radioactive materials but also other carcinogens such as compounds of
beryllium and volatile organic compounds that will eventually contaminate the groundwater.
Rocky Flats will be opened
to the public for general recreation, and I shudder to think of children playing at this site. As
a former member of the Rocky Flats Citizens Advisory Board and a chemist, I find this unacceptable.
This isn't a cleanup, it's a cover-up.
References
1. GEI Consultants Inc, Interim Measure/ Interim Remedial Action: For Groundwater at the Rocky Flats (rep. prepared for the city of Westminster and the city and county of Broomfield, CO), Glastonbury, CT (10 February 2005).
2. S. F. Dwyer, Review of the Original Landfill Closure Design, Specifications, and CQAP for the Rocky Flats Environmental Technology Site, Golden, Colorado (rep. prepared for the Woman Creek Reservoir Authority), Sandia National Laboratories, Albuquerque, NM (23 May 2005).
3. Muller Engineering Co Inc, Walnut Creek Drainages Pond Reconfiguration Review (rep. prepared for the city and county of Broomfield, CO), Muller Engineering Co Inc, Lakewood, CO (28 March 2005).
Clark, Janecky, and
Lane reply: The letters from William Alschuler and Anne Fenerty raise many interesting points;
we will address the major ones. Of particular relevance is the unprecedented stakeholder involvement
that enabled the cleanup of Rocky Flats. Although there were many perspectives surrounding issues
such as cleanup levels, dirty demolition, landfill capping, and 903 Pad remediation, all organizations
helped advance the removal of plutonium and reduction of the risks to metropolitan Denver.
An example of stakeholder
involvement and communications was the formulation of actinide cleanup levels. Many stakeholders
were concerned by the original radionuclide soil action level (RSAL) of 651 picocuries per gram
of plutonium, acceptable under Superfund regulations. Intense community concern prompted the
Department of Energy (DOE) to fund a citizens' group to reexamine RSALs; though members did not
reach consensus, they helped emphasize protection of surface water that could leave the site during
the necessary trade-off between cleanup of more highly contaminated surface soils and the disturbance
of vegetation, streams, and soils. That extensive public process developed a much reduced RSAL
for surface soil (50 pCi/g) while allowing for more residual contamination at depth beneath old
building sitesan approach that had wide support. As Fenerty's letter implies, not every
stakeholder concern could be satisfied. The containerized waste was sent to two disposal facilities,
one DOE's and one commercial.
Most of the site (3900 of
6200 acres) has been transferred to the Interior Department to become a national wildlife refuge.
The former industrial area will remain restricted and under DOE jurisdiction. The cleanup has
significantly reduced risk, but ongoing monitoring and maintenance by the DOE Office of Legacy
Management remain vital to ensuring long-term protection of human health and the environment.
In addition, the US Congress approved legislation in 2004 creating the Rocky Flats Stewardship
Council to focus on issues central to the site's post-closure care and management.
Regarding independence,
anyone in the US who has experience and expertise with plutonium has been funded at some time by DOE,
including us and the Rocky Flats Citizens Advisory Board. As scientists, we always hope that our
science is brought out in public discussions and then used to improve the technical basis for decision
making, so that decisions will be more transparent, repeatable, and thus scientifically defensible.
Describing the value, process, and results of our participation was a major driver in developing
the article for PHYSICS TODAY. For us, the invitation to become involved in cleaning up Rocky Flats
was an ultimate opportunity for science in the public interest. We remain committed to working
with all participantssite contractors, regulators, governments, stakeholder organizations,
individuals, and the international scientific community.
Rocky Flats, the largest,
most complex environmental cleanup in US history, was completed nearly 50 years sooner and $30
billion lower than initial estimates. The cleanup removed plutonium and reduced risks to metropolitan
Denver. It was many things, but through broad-ranging community participation, it is certainly
not a cover-up.
Additional resources
US Department of Energy, Office of Legacy Management, [LINK].
US DOE, Office of Legacy Management, Rocky Flats site, [LINK].
National Research Council, Commission on Geosciences, Environment, and Resources, Long-Term Institutional Management of US Department of Energy Legacy Waste Sites (2000), National Academy Press, Washington, DC (2000), [LINK].